Burkina Faso
15MWp or 12MWac solar PV
The Essakane gold mine in Burkina Faso receives its needed power from Africa’s largest engine-solar PV hybrid power plant delivered by Wärtsilä. Benefits for the mine include reduced fuel costs and a smaller carbon footprint. The capability to control and optimise the usage of the solar PV power and engines enables the gold mine to reduce its fuel consumption by an estimated 6 million litres per year and its annual CO2 emissions by 18,500 tons.